Warrnambool Flood Study
Project: Warrnambool Flood Study
Client: Warrnambool City Council
Purpose: Detailed Flood Study
Timeframe: 2010
Project Description: Capture of detailed level data along key river beds, creek beds and low lying areas to establish a comprehensive digital terrain model. Adjoining residential floor levels were also recorded for review and modelling control. The client utilised the 3D data for purposes of flood analysis, risk management, planning and possible future water harvesting and management.
|